Port of Astoria v Hodel

Abstract

Port of Astoria v. Hodel – BPA was required to prepare an Environmental Impact Statement before deciding to build a new transmission line and enter into a power sales contract with an aluminum smelter. The EIS would need to address these actions in relation to BPA’s proposed Hydro-Thermal Power Program. This suit and several others gave rise to the Northwest Power Act.

CRITFC Science Team

CRITFC’s Fish Science department consists of geneticists, hydrologists, fish biologists, biometricians, meteorologists, and other scientists dedicated to studying salmon and their ecosystem.